2024 Upgrades
- Exterior windows re-caulked
- Rubrail re-caulked
- Water Maker had new membranes installed
- Rudders dropped and new seals installed
- Hull waxed
- Two new hydraulic rams on swim platform
- Head Hunter waste treatment plant upgraded
- New master cabin blinds
- New blackout curtains
- New galley cushions
- All countertops polished and sealed
- Tables refinished
- Generator hours: Port 4,760 | Starboard 4,790
- 4 new Apple TVs
- New aft deck refrigerator
- New crew refrigerator and chest freezer, Sept
- New ABT stabilizer controller, June
Hull three-step wax, Sept
Rudders dropped and fully serviced, Sept
Stabilizers dropped and fully serviced, Sep
Master Stateroom Headboard recovered, Se
2023 Upgrades
- Flybridge Windows re-chalked, April
- Props sent out to be balanced, Nov
- Hull and Topside Full Polish
- Engine and Generator Services
- Upgraded the Hatteras monitoring system to glass panel touch screen. Props sent out and 2023 serviced
- Replaced both 100 amp power cables with 125 feet of cable
- Added remote controls for Glendenning cable masters
- Upgraded exterior camera system
- Refinished fly bridge tables
- Service Headhunter Treatment Plant
- Service on water maker and spot zero machines
- New exterior covers
- New boarding stairs
- New fresh water pumps
- Windlass serviced and anchor chain marked
- Bottom Paint
- New Cutlass Bearings
- 2 New Underwater Lights
2022 Upgrades
- Underwater Lights -10 Blue and White
- New Upgraded JL Audio Sound System Aft & Bow with Sub-Woofer
- New Master Stateroom Custom Mattress-Top of line Handcrafted Mattress Co.
- Hydraulic Lift Swim Platform
- LED Exterior Lighting Blue/White
- Touch Screen Helm Monitor
- Marine NAV
- Wolf 4 burner Stove Top Induction
- LED Lighting in Salon
- Cabinet behind bar
- Forward Sun pad
- Awnings /Sunshades Aft Sky Lounge Deck
- Awnings/Sunshades Forward
- Tint Windows for Heat Reflection
- New Cushions Entire Exterior
- Hydraulic HI/LO Tables exterior Bridge Deck
- New Teak Deck upper Aft Deck Sky Lounge 2018
- Hatteras Monitor Systems New Ship's Computer
- New aftercoolers installed on engines December 2021
- GP Link Engine Monitoring Installed 2022
- New underwater lights